Tuesday, March 24, 2009

Demolition

So taking out the old vanity in my bathroom was a four hour job for three people. Evidently plumbing standards were "plumbing suggestions" in 1978. I can hardly believe the mess this thing was. And to get to anything, we had to ooze through layers of mold and rotted caulk. Oh, and the builder used regular drywall behind the sink instead of green board or cement board like someone who is not an idiot. So I also had to patch disintegrating drywall. Now, of course, it needs painted because it looks like patched drywall.

And since we got the old vanity out (in pieces), we see that one of the shut-off valves leaks. We have to fix this before I can start on the floor. Because there is a big vanity-shaped patch of cement in my bathroom, with no flooring. Around it are three layers of flooring, each more horrific than the last. The bottom layer is thankfully past my ability (interest) to dig out. The second layer is bright almost-Williamsburg blue. The top layer is mauve. I don't know why, because it clashes with the pumpkin colored walls. If there were ever a room crying out for a neutral, it is this one.

I just have to thank God that we escaped the harvest gold bathroom fixtures.

1 comment:

Leigh Russell said...
This comment has been removed by a blog administrator.